CTS Quarterly Customer MeetingCTS Disaster Recovery (DR) Project October 22, 2014 |
2 |
 |
AgendaDefinitions CTS DR Current State CTS DR Upcoming Enhancements CTS DR Project 2 |
3 |
 |
COOP and DR Definitions3 |
4 |
 |
COOP / DRContinuity of Operations Plan Guided by FEMA established policies, definitions and assumptions that form the framework for emergency preparedness. Includes the activities ensuring that essential functions which enable agencies to provide vital services, exercise civil authority, maintain the safety and well being of the general populace, and sustain the industrial/economic based in an emergency are performed. Disaster Recovery Plan (DR) Recovery of information technology assets, data, and services required to support critical business functions 4 Note: Backup/Recovery are different from Disaster Recovery |
5 |
 |
Business Impact AnalysisWhen creating Disaster Recovery Plans, agencies identify their critical systems and document the operational, legal, and financial impact from a disruption or disaster affecting any computer or telecommunication service area of the agency. We are asking that Agencies work with CTS to collaborate regarding critical systems which are dependent on CTS systems. 5 |
6 |
 |
Disaster Recovery TermsWhen planning for recovery, agencies identify RTO and RPO for their systems. A recovery time objective (RTO) is the period within which systems, processes, services, or functions must be recovered after an outage. A recovery point objective (RPO) is more specific to information systems. It is the amount of data that can be lost measured by a time index. Agencies should work with CTS to collaborate regarding recovery objectives that are dependent on CTS systems. 6 |
7 |
 |
DR Site and Data Replication TermsDR Site Options/Methodologies Hot (space, equipment, and data already present - only minor configurations changes needed) Warm (space and equipment is in place but typically has to be built/configured/data restored) Cold (space reserved with no equipment) Data Replication Options/Methodologies: Active/Active (synchronous) Active/Passive (asynchronous) Restoration from backup 7 |
8 |
 |
CTS Disaster Recovery8 |
9 |
 |
CTS Services with DR - Current StateEastern United States: IBM and Unisys Mainframes, TSM, DES Print Eastern WA Node Site: Shared Services Email (Exchange, Virus Protection, Filtering, Secure Email) Enterprise Active Directory (Active Directory Federated Services, Domain Controllers) Domain Name Services (DNS) (Hosted in Oregon) Security Services (Secure Access Washington®; Secure File Transfer; SSL VPN) Redundant SGN Internet Service Providers (ISPs) Liberty Lake, WA (TierPoint): Customer disaster recovery equipment 9 |
10 |
 |
CTS DR Upcoming EnhancementsAvamar and VTL Projects TSM Service (for physical tape backups) is sunsetting and will be replaced by Avamar (virtual backups) Mainframe Virtual Tape Library will expand to eliminate need for physical tapes CTS’ Private Cloud Roadmap includes DR Load Balancing Mobile Device Management Implementing a Software as a Service (SaaS) Solution 10 |
11 |
 |
CTS Disaster Recovery Project11 |
12 |
 |
12 |
13 |
 |
DR Project BackgroundDR Site Survey Project Findings No government-owned data center in Eastern Washington met the requirements and/or allowed sufficient room for expansion to meet CTS needs Existing Spokane Node DR site not a suitable long term DR Facility TierPoint contract was nearing end of life Decision was made to secure a contract with a Vendor to provide colocation data center services. 13 |
14 |
 |
DR Project StatusScope Identify Requirements for a single site DR location Develop and publish RFP for DR site procurement Released 7/29/14. Review and select appropriate site Responses were received 9/4/14. Announcement planned for 9/26/14. Build out core Network and Security Infrastructure Move existing CTS DR services to new DR colocation data center. Define CTS’ future DR roadmap Implement and expand DR in a phased approach Establish new CTS DR service offering 14 |
15 |
 |
DR Colocation Site ASVSabey Data Center Properties, LLC Over 3 million square feet of data center space Close to 2 million square feet of data center space in Washington Quincy, Wenatchee, and Seattle Sabey’s DC in Quincy was selected 525,000 square feet of data center space Concurrently maintainable facility 70 megawatts of power Security personnel on site 24/7 Dedicated Office and Storage Space available 15 |
16 |
 |
High Level DR Site RequirementsSome of the requirements include: Within the State of Washington and east of the Pacific Crest Trail Service Availability of 99.982% Vendor background checks HIPPA Business Associates Agreement compliance NIST 800-53 Security and Privacy Controls for Federal Information Systems and Organizations compliance ANSI/TIA-942 A-1 Telecommunications Infrastructure Standard for Data Center compliance 24/7 hours of operational and physical access Vendor provided enclosures Concurrently Maintainable Facility (facilities components can be shutdown w/o disruption) Technician Support Services (remote/smart hands) Dedicated office space and equipment storage space Staff facilities during declared disaster 16 |
17 |
 |
DR Timeline Through June 2015 |
18 |
 |
QuestionsMark Quimby DR Architect Consolidated Technology Services mark.quimby@cts.wa.gov (360) 407-8830 Heidi Brownell Chief Project and Planning Officer Consolidated Technology Services heidi.brownell@cts.wa.gov (360) 407-8980 18 |